Sign In | Join Free | My enlightcorp.com
China Shenzhen Zhong Jian South Environment Co., Ltd. logo
Shenzhen Zhong Jian South Environment Co., Ltd.
We are one of the first high-tech enterprise in the industry that provides technical solutions for air pollution control and treatment.
Verified Supplier

2 Years

Home > Modular Clean Room >

modular cleanroom design Cleanliness levels from ISO Class 3 (Class A) to ISO Class 8 (Class 100,000)

Shenzhen Zhong Jian South Environment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

modular cleanroom design Cleanliness levels from ISO Class 3 (Class A) to ISO Class 8 (Class 100,000)

Brand Name : ZJNF

Place of Origin : China

MOQ : 1

Price : negotiate

Payment Terms : tt lc PayPal credit card

Delivery Time : 18days

Packaging Details : plywood/wooden package

Overall Dimension : Customized

Body Material : Cold-roll Steel /Stainless Steel

Door Material : Stainless Steel

Filter Efficiency : 99.99%

Air exchange rate : 100,000-grade 10-15 times/hour

Temperature : 24 C–26 C in summer; 20 to 22 DEG C in win

Material : Stainless Steel,Stailess Steel SUS304/201/Q195 /galvanized Sheet,sandwich panel,fire-proof),laminated board(scratch-proof

Application : 100 Lab / Laboratory Clean Room,Pharmaceutical,Chemical Lab,Electronic plant,Hospital

Type : Clean Room Booth,Modular Designs,cleanroom

Usage : Air Purification System,Pharmaceutical factory or laboratory,Dust Free Working for lcd glass oca laminating,Laborotory,clean requirement

Contact Now

Covering Core Technical Features, Implementation Processes, and Industry Applications

I. Core Technical Features

  1. Modular Structural Design

    • Main framework, envelope systems, and purification equipment (FFUs/air showers, etc.) are pre-fabricated as standardized modules, enabling flexible assembly and expansion.
    • Material reuse rate reaches 98%; only consumables like sealants require replacement during relocation or renovation.
    • Features large double-glazed viewing windows with high transparency and airtightness (dual-layer foam-sealed adhesive bonding).
  2. Intelligent Environmental Control

    • 10-inch touchscreen integrated control system provides real-time monitoring of temperature, humidity, differential pressure, cleanliness, etc., with remote control via mobile/PC.
    • DC-motor FFU units reduce energy consumption by over 60%, with an additional 9% saving in standby mode.
    • Employs "dual HEPA + UV sterilization" exhaust technology to ensure emission safety (e.g., in biopharma labs).
  3. Construction Efficiency Advantages

    • Factory-preassembled components (doors, windows, air outlets, etc.) enable on-site installation in only 3–5 days, 30% faster than traditional construction.
    • Eliminates on-site cutting, minimizing construction contamination.

II. Implementation Process & Standards

  1. Construction Workflow

    • Site measurement → framework assembly → flooring → equipment installation → electrical setup → performance validation.
    • Acceptance requires 3 consecutive days of viable particle monitoring (e.g., ≤1 cfu/m³ for Grade A zones).
  2. Cleanliness Control

    • Cleanliness levels from ISO Class 3 (Class A) to ISO Class 8 (Class 100,000), adjusted via FFU coverage (100% coverage for ISO Class 5) and air-change rates.
    • Precision humidity control (e.g., 45% ±5% for biopharma applications).
  3. Material Specifications

    • Framework: Aluminum profiles / electrostatic-sprayed square steel tubes / SUS304 stainless steel (anti-static, corrosion-resistant).
    • Envelope: Baked-paint steel plates or stainless steel plates; flooring uses epoxy resin/PVC.

III. Application Scenarios & Case Studies

  • Biopharmaceuticals‌: Solved high-humidity contamination during monsoon season for a Wuhu-based pharmaceutical plant, complying with Technical Code for Biosafety Laboratories.
  • Semiconductors/Electronics‌: Supports ISO Class 3 cleanliness requirements and micro-environment control for vibration-sensitive equipment (e.g., EUV lithography machines).
  • New Energy/R&D‌: Rapid-deployment solutions for EV battery workshops and university labs, ideal for small-scale (<500 m²), high-flexibility needs.

IV. Comparison with Traditional Cleanrooms

Comparison Criteria Modular Cleanroom Traditional Cleanroom
Construction Period 3–5 days Months (incl. civil works)
Renovation Cost Low (material reuse) High (requires demolition)
Flexibility Supports rapid relocation/reconfiguration Fixed structure, difficult to modify
Optimal Area Cost-effective for <500 m² Suitable for large workshops

Product Tags:

modular cleanroom ISO Class 3

      

modular cleanroom ISO Class 8

      

modular cleanroom with cleanliness levels

      
Quality modular cleanroom design Cleanliness levels from ISO Class 3 (Class A) to ISO Class 8 (Class 100,000) for sale

modular cleanroom design Cleanliness levels from ISO Class 3 (Class A) to ISO Class 8 (Class 100,000) Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen Zhong Jian South Environment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)